€101.350 The share price increased by +3.02 %   01/07/2024 13:13

Road in Corsica

Illustration image

25 February 2013 - Projects update and handover - France

In December 2012, after 11 months of works, the teams from Signature Grands Travaux and Corse Travaux (both Eurovia subsidiaries) have finished building a 2x2-lane, 9 km-long road entering Bastia (Haute-Corse) from the south. The works notably involved supplying all the surface drainage and the steel and concrete safety installations.
Contract value: €5.9m.